In short
- A configurator needs three kinds of data: items, rules and prices.
- The rules are usually the hard part, since they are rarely written down.
- Appoint an owner per data type before the project starts, not after launch.
Contents
Why the product data decides the project
A configurator is never better than the data it is built on. If the variants are wrong, the rules incomplete or the prices out of date, it does not matter how good it looks. The customer gets a result that cannot be delivered, and trust is gone.
This is also where projects tend to drag on. The build can be planned, but nobody knows how long it takes to pin down the rules until you start looking. That is why it pays to do a review before asking for quotes.
Three kinds of data
Items and variants
Which products, modules, options and materials exist, with item numbers, dimensions and descriptions? This usually exists in ERP or PIM, but not always in the form the configurator needs. An item may exist in twelve colours in the warehouse but only as one line in the product catalogue.
Rules
What can be combined, what requires what and what excludes what? The rules are often in several places: in product sheets, in Excel with product management, in the salespeople’s experience and in the engineers’ heads. Sometimes they contradict each other.
Prices
List prices, surcharges for options, discounts per customer or market, currencies and VAT. The pricing logic can be simple or very complex, and it changes more often than the products.
How to do a review
- Choose one product family. Ideally one that sells a lot and has clear variants. It becomes the test case for the rest.
- List every choice a customer makes, in the order a salesperson would ask.
- Write down the rules for each choice: what is affected, and why. ”Not possible” is not enough, write the reason.
- Mark the source for each piece of information: ERP, PIM, Excel or a person.
- Test with real orders. Take ten old orders and see whether the rules would have given the same result.
The review often takes a few weeks and gives two things: a realistic picture of how big the job is, and a brief that makes suppliers’ quotes comparable.
Common problems
| Problem | Consequence in the configurator | Action |
|---|---|---|
| Rules only exist with specialists | The configurator allows wrong combinations | Workshops and written rules with reasons |
| The same item with different data in different systems | Wrong price or dimensions shown | Decide which system is the master |
| Variants that are no longer sold remain | The customer can choose what cannot be delivered | Clean up the range before the build |
| Prices in Excel outside ERP | Manual updates, risk of outdated prices | Move the pricing logic to one place |
Who owns what?
Appoint one owner for items, one for rules and one for prices. It can be the same person in a smaller company. The owner decides on changes and makes sure the configurator is updated. Without an owner the configurator quickly becomes outdated, and salespeople stop trusting it.
A made-up example: the shelving system
A company sells a modular shelving system in three widths, five heights and four colours, with twelve accessories. ERP holds 240 items. It sounds structured, but when they go through the rules it turns out that three of the accessories only fit certain widths, that one colour does not exist in the tallest height, and that wall-mounted sections require a special bracket depending on the wall type.
None of those rules exist in ERP. Two are in a product sheet, one is in an Excel sheet with the product manager and the rest are only known by customer service. The review takes three weeks, but afterwards there is a list of 34 rules, each with an explanation and an owner. That list becomes both the basis for the request for quotes and the test cases for the finished configurator.
The example is made up, but the pattern is common: the data looks complete until someone tries to write down the rules.
Inventory template to download
The template has one row per rule or attribute, with the columns below. The first three rows are made-up examples from a shelving system, to show how a rule is written with a reason and a test case.
| Column | What you fill in |
|---|---|
| Choice / item | Which choice or item it concerns. |
| Attribute and allowed values | For example width: 60 and 80 cm. |
| Rule and reason | What depends on what, and why. ”Not possible” is not enough. |
| Source and owner | Where the information is today and who decides on it. |
| Test case | A specific choice that should give a certain result. |
Frequently asked questions
Does all the data have to be ready before we start?
No. It is enough for the first product family to be ready. The rest can be structured in parallel with the build.
Do we need a PIM system?
Not always. With a limited range, ERP or a well-kept table works. With many channels and languages, a PIM is often worth it.
Can the supplier do the review for us?
Yes, but someone in your organisation must be able to answer the questions and make decisions. Knowledge of the products cannot be bought in.