Integrations: ERP, PIM, CRM and e-commerce

Integrations often increase the value of a configurator by removing manual steps. How to plan the integrations and avoid the most common problems.

Uppdaterad

In short

  • Decide which system owns which data before you build connections.
  • Start with the integrations that remove manual work after the last choice.
  • Always ask who maintains the connection when a system is upgraded.

Why the integrations decide the value

Even a stand-alone configurator can add value, but integrations often increase the value by removing manual steps. When the result has to be typed into another system again, part of the time saving is lost, and new errors can arise. That is also where projects often become more expensive than planned.

The most common systems

ERP

The business system often holds items, prices, stock and orders. The configurator can read items and prices from there, and send back an order or a production structure. The question is how often the data should be synchronised and what happens if ERP does not respond.

PIM

A product information system collects descriptions, images and attributes for several channels. If you have a PIM, it is often the right source for texts and attributes, while price and stock come from ERP.

CRM

The sales system holds customers, opportunities and quotes. For CPQ, the connection to CRM is central: the configuration needs to be linked to the right customer and deal, and the quote saved where the salespeople work.

E-commerce

In an online shop, the configuration should be able to go into the cart with the right price and a description that customer service and the warehouse understand. Check that the platform can handle configured products, not just fixed items.

Who owns what?

DataUsual ownerThe configurator
Items and structureERP or PLMReads
Texts and imagesPIMReads
RulesThe configuratorOwns
PricesERPReads, calculates
Customers and dealsCRMReads, writes quote
OrderERP or e-commerceWrites
Example of an allocation. Yours may look different.

How to plan

  1. Draw the flow from the first choice to delivery, and mark every time data moves between systems.
  2. Mark which steps are done manually today. They give the most value to automate.
  3. Decide the master for each type of data.
  4. Choose which integrations are included in the first version. The rest can be manual for a while.
  5. Require documented interfaces and test environments from everyone involved.

Common problems

  • Different item numbers or units in different systems.
  • Prices calculated differently in the configurator and in ERP.
  • Connections that stop working when a system is upgraded, without anyone noticing.
  • No one is responsible for the connection, since it sits between two suppliers.

A made-up example: from three systems to one order

A company has items and prices in ERP, descriptions and images in a PIM and customers in CRM. Before the configurator, a salesperson creates a quote in Excel, copies in prices from ERP and saves a PDF in CRM. When the customer orders, the order department types everything into ERP again.

In the first version, the configurator is connected to ERP for items and prices, and to CRM for customers and quotes. The order is still sent as a PDF, since the ERP connection for orders is the most complex and requires a decision on how configured items should be stored. Even that removes two manual steps.

In version two, the order is connected directly to ERP. Then the last manual step disappears, and with it the errors in order entry. Splitting it up like this gave value earlier and lower risk than doing everything at once.

Frequently asked questions

Does everything have to be integrated from the start?

No. It is often wise to start with one or two connections and leave the rest manual until the solution has proven its value.

Who should build the integrations?

Whoever knows the systems best, but someone must have overall responsibility. Write it into the contract.

Can the configurator work if ERP is down?

It depends on how it is built. Ask how the data is cached and what the user sees if a system does not respond.

Integrationer: konfigurationen blir en artikellista som går till e-handeln
Pahlén’s parts list. Image: Animech.

Sources and further reading

Read more

Next step

Next step in the work: maintenance

The integrations need to be maintained. Plan the maintenance before the project ends.

Already have a project under way? Tell us about your project.